STAROIL: Provision of PMC for the Fast Track Development Projects, Block 17

staroil

Closed Project

Provision of PMC for the Fast Track Development Projects, Block 17, SUDAN – December 2011 – March 2014

CTS provided the PMC services for the closed-out facilities projects (phase I) for Block 17 of the Muglad Basin. The PMC scope of work included the construction and development of following surface facilities:

  • Early Production Facility (EPF).
  • FSF package (wells tie-in, truck lines, OGMs).
  • Sales oil storage tank.
  • Operation base camp & access road.
  • Main crude oil export pipeline.
  • Power generation & distribution system.

Back to Projects