WNPOC: Provision of PMC for WNPOC, Block 5B

winpoc

Closed Project

Provision of PMC for WNPOC, Block 5B, SUDAN/SOUTH SUDAN- June 2011 – April 2012

As a part of the WNPOC’s strategy in increasing the production from Block 5B of the Muglad Basin, CTS provided the PMC services for the Engineering phase of the following proposed surface facilities:

  • FSF: tie-in of new wells & construction of new OGMs.
  • Upgrading of Tharjath CPF.
  • Crude oil export pipeline.
  • Power generation & distribution system.
  • SCADA & communication.
  • Infrastructure.