PDOC: Provision of PMC for PDOC Phase 2 Project, Block 3 & 7

petrodar

Closed Project

Provision of PMC for PDOC Phase 2 Project, Block 3 & 7, SUDAN/SOUTH SUDAN – July 2007 – May 2012

CTS provided PMC services for the development of the oil fields within block 3 & 7 of the Melut Basin (Phase II). The PMC scope of work included the development & upgrading of the following surface facilities:

  • Al-Jabalyn CPF upgrading.
  • Palougge FPF upgrading.
  • Gummry Field development (FPF Package).
  • Moleeta field development (FPF Package).
  • Gummry-Moleeta FSF & pipeline package.

Back to Projects